Verification phase

From Gaia Science Alerts Working Group
Revision as of 17:41, 2 July 2009 by Lukasz (talk | contribs) (Created page with 'Main aim of the Verification Phase is to verify the robustness of the issued alerts and confirm them with the dedicated set of follow-up telescopes. This should reveal all necess...')
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Main aim of the Verification Phase is to verify the robustness of the issued alerts and confirm them with the dedicated set of follow-up telescopes. This should reveal all necessary adjustments to be done in the detection algorithm to assure the best and the most robust performance later on.

Verification Phase will last for 2-3 months and is planned to take place as early in the mission as possible, as soon as the alerting system is ready to perform. Currently, it seems it will happen only after the first cycle (half a year, i.e. late 2012/early 2013), as the accumulated data ("baseline flux") will not be available before.